A fleet of Leopards — stripped, rebuilt, delivered on time.
The challenge
A fleet of Sandvik Leopard surface drills due for major work under a shut program — booms, masts and engines all at the end of their interval, on a schedule with no room to slip.
What we did
Full boom and mast strip-downs and refurbishments across the fleet — feed rails, chains and wear components renewed — plus engine mid-life rebuilds and the mechanical work in between, all run to the shut schedule.
The outcome
Every Leopard handed back rebuilt and on time. The photos tell it — strip, refurb, and back up ready to drill.
Shut program
Fleet rebuild
Boom & mast refurb
Engine mid-life